By raising the roofs and the new roof construction, the two attic rooms 4 and 6 have gained considerably in size and height. Both rooms were given an additional skylight facing south. Parts of the masonry were exposed and the rest was replastered. A parquet floor was laid. Here is the change:
[photo-book-gallery id=”1084″]
Room 4: Picture 1 to 4 (picture 1 before)
Room 6: picture 5 to 8 (picture 5 before)